Mapping the workflow before drawing the counter
A bubble tea counter is a production line with a customer on one side of it. Before any elevation is drawn, we map the sequence: order, cup, tea or base, toppings, shaker or sealer, lid, hand-off. Each step needs a surface, and each step needs to be reachable without the operator crossing the path of the person doing the next step.
The single most common failure we see is a counter where the sealer and the pickup point are at opposite ends, so every drink crosses the whole counter. At two drinks a minute that is fine; at peak it stalls the line. Tell us your peak throughput and how many staff work the counter at once, because a two-person counter and a four-person counter are different layouts, not the same layout at different lengths.
We separate the counter into zones and keep the customer-facing run clean. Ordering and pickup sit at the front; the loud, wet and messy work sits behind or to the side. The same zoning logic runs through our other cafe counters, whether the shop sells tea, coffee or dessert.
- Peak drinks per hour and staff count at peak
- Equipment list with model numbers and dimensions
- Whether ordering is at the counter, by kiosk or by app pickup
- Where the back-of-house door sits relative to the counter
Equipment cut-outs and undercounter space
Cut-outs are only as good as the equipment data. We need the actual model of the sealer, the shaker, the fructose dispenser, the tea brewer, the ice machine and the undercounter fridge, with their footprints and their clearance requirements. Manufacturers usually publish a spec sheet; send it rather than a photo of the machine.
Undercounter refrigeration needs air. A fridge slotted into a tight joinery opening with no ventilation gap will run hot and fail early. We detail a ventilated opening with a removable front panel, and we place the fridge so its door swing does not block a working position.
Sink positions, drain locations and the rough-in for water are coordinated with the site plan and installed by local licensed trades. We build the cabinet with the openings, the access panels and the service route; the connections themselves happen on site. If the plumbing positions are not final when we start drawings, we build in access panels so the run can be adjusted later without cutting the cabinet.
Work tops, splash zones and waterproofing
The wet zone is where counters die. Sugar syrup, tea, milk and condensation attack any joint that lets water sit. We use stainless steel work tops in the wet zone because it is non-porous, takes a hot pot and cleans with a wipe, and because a welded and ground stainless top has no seam for liquid to enter.
Where the buyer wants a warmer look, we use solid surface with coved joints on the customer side and keep stainless behind the line where the customer does not see it. That combination gives the shop the look it wants at the front and the surface it needs at the back.
Splash returns at the wall, a raised rear lip on the work top and a sealed junction between top and cabinet all stop liquid reaching the substrate. Toe kicks are stainless-faced and set back so mopping does not soak the cabinet base. None of this is a certification claim; it is simply construction that survives a wet shift and wipes down quickly.
- Stainless work tops with welded, ground joints in the wet zone
- Coved or sealed junctions where the top meets the wall or the cabinet
- Raised rear lip to keep spills off the floor and the wall
- Stainless-faced, set-back toe kick for mopping
POS, power and data on the counter
The POS terminal needs a flat, dry position within reach of the order point, a cable route that is not visible to the customer, and a place for the printer and the cash drawer that does not eat working surface. We build a dedicated POS block with a cable chase down the inside face of the cabinet and a service panel at the back.
Power outlets are positioned per appliance on the drawing, with the count and location confirmed against the equipment list. Data or network cable for the POS and for any order screen runs in a separate chase. Final electrical connection is done by a licensed local electrician; what we supply is the joinery, the chase, the outlet mounting positions and a wiring layout.
If the shop uses a digital menu board or a lit sign above the counter, its supply is planned at the same time. Adding a lit sign after the counter is built almost always means a visible surface-mounted cable.
Finishes that survive sugar, tea and daily cleaning
Tea stains. Brown sugar syrup is sticky and acidic, and it gets everywhere. The customer-facing front panels take fingerprints and bag knocks; the operator side takes splashes and cleaning chemicals. We specify a hard, non-porous finish on both, and avoid textured surfaces in any position where syrup can settle into the texture.
High-pressure laminate, solid surface and powder-coated metal all clean well. Open-pore timber and unsealed MDF edges do not, and they are the parts a low-cost supplier is most likely to use because the difference is invisible at handover. Ask any supplier what the edge treatment is on the wet-zone cabinets.
Corner and edge protection matters more than it sounds. Cart wheels, mop handles and delivery boxes hit the same corners every week. A metal edge or a radiused hard edge at the counter ends keeps the unit looking new through the first year.
Modules, crating and installation
We build the counter at our factory in Huizhou, China, assemble it fully, fit the tops, check the cut-outs against the equipment dimensions, then split it into transport modules along planned joint lines. The joint lines are drawn deliberately so they fall where a reveal or a material change hides them.
Modules are crated for export in heat-treated timber with foam protection on every finished face and separate crating for stainless tops, which scratch if they travel loose. Sea freight to North America is standard; the module sizes are set so they clear a standard mall service corridor and a typical storefront door.
On site, the modules are set, levelled, joined and sealed, then the equipment drops in and the local trades connect services. A counter that was pre-assembled at the factory installs in hours rather than days, which is what makes an overnight or early-morning installation realistic. Lead time depends on the counter size, the finish and the equipment schedule, and is confirmed after drawings are approved; see the lead time guide. For an example of a beverage fixture built this way, see the Chako Lab drinkware kiosk.
What to send for an accurate quote
Send the floor plan with dimensions, photographs of the space, the equipment list with model numbers, your peak throughput, and brand references or a logo. If the shop is inside a mall, send the landlord's design criteria too, because it may restrict counter height, materials and signage.
Tell us whether the counter stands alone or is part of a kiosk. A counter inside a custom mall kiosk package is quoted differently from a counter going into an inline store, because the kiosk carries the structure, the canopy and the landlord drawings with it.